Check out the new shelter installed 3/2/16. It has been a long struggle to get this completed. Still to come is an electrical connection for the interior shelter light and a minimum 5-foot wide cement strip in place of the grass strip between the sidewalk and curb edge.
https://www.facebook.com/RideBT/photos/a.420611131481204.1073741833.411146475761003/470535229822127/?type=3&theater
From BT's Facebook Page